Nebraska Revised Statute 39-2812

Chapter 39

39-2812.

Process; provisions applicable.

(1) The process for selecting a design-builder and entering into a design-build contract shall be in accordance with sections 39-2813 to 39-2816.

(2) Except as otherwise specifically provided in the Transportation Innovation Act, the process for selecting a progressive design-builder and entering into a progressive design-build contract shall be in accordance with sections 39-2813 to 39-2816.