LR96

Interim study to examine the long-term public power generation and transmission options in the state

LR96 Actions
Date Description Journal Vote
May 24, 2019 Referred to Natural Resources Committee 1799
Apr 29, 2019 Referred to Executive Board 1322
Apr 29, 2019 Date of introduction 1322